Example EX4
- Old method
- 160
- New method
- 110
- Old method
- 710 kg
- New method
- 79 kg
50 fewer bars and 631 kg less waste.
For contractors and rebar yards
Upload the drawing as a PDF. The AI reads the rebar schedule and each bar’s shape, you check the rows, and Rebarcut works out the cutting plan with the least steel, the order and the PDF for the yard.
Free during the pilot.
3 × 4.64 m mark 8
scrap 0.08 m
4 × 2.67 m mark 19
offcut 1.32 m → warehouse
It all happens on one page, “New cutting plan”.
One or more drawings, as you get them from the design office. No PDF? Type the rows or bring them in from Excel / CSV.
Bar mark, Φ, quantity and length for every row, together with each bar’s shape and its dimensions, as on the drawing.
You see the table next to the drawing and fix anything that needs it before calculating.
Per Φ and bar length (12, 13.50 or 14 m, or your own length). Scrap up to 0.50 m shows in red; longer offcuts go to the warehouse for the next plan.
The order for your supplier and the cut list as a PDF. The cut list also reads well on a phone.
Measured on real examples and drawings from the pilot, 4 November 2026.
50 fewer bars and 631 kg less waste.
Waste fell by 483 kg.
On two real bridge drawings the AI read every row of the rebar schedule exactly. It can still make mistakes, so you always check the rows before calculating.
Payments are switched off during the pilot. Contact us for access.
Upload a drawing PDF and compare the cutting plan with the way you cut today.
New cutting plan